NET-ZERO THERMAL · 5–7MW
Food & Beverage
Net-Zero Brewery Design
Engineering Walkthrough Coming Soon 3–5 min · Commercial summary included
Industry
Food & Beverage
Results Delivered
3 Verified Outcomes
Greenfield brewery with zero-net-carbon thermal energy. 100% renewable/recovered thermal; 5–7 MW; 800m³ storage.
Engineering Journey

Challenge

Design a new brewery with zero-net-carbon thermal energy generation.

Solution

Solar thermal collectors, thermal storage, waste heat recovery and electrification strategy.

Results

  • 100% thermal demand supplied from renewable and recovered sources
  • 5–7 MW thermal capacity
  • 800m³ thermal storage system

Commercial Impact

Elimination of long-term fossil fuel dependency and carbon costs